Udemy - Testing Commissioning SwitchGear

Video Tutorials, Courses



Udemy - Testing Commissioning SwitchGear
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz, 2 Ch
Genre: eLearning | Language: English + srt | Duration: 18 lectures (4h 38m) | Size: 1.4 GB
Reading Scheme


What you'll learn:
An overview of electrical transmission substation.
Basic concepts about circuit breaker and Types of circuit breaker.
Why don't the distributor's switchgear have the same capacity ?
The importance of having a dc ac voltage inside the distributor cells
The main rules for reading the scheam of current circuits and the reasons that lead to their explosion.
Understand the general philosophy of closing, triping and interlock circuits.
What is the working theory of anti-pumping relay and anti slam ?
Importance of trip circuit supervision in the early detection of circuit breaker faults.
The most important modifications in the scheam before the distributor enters the service.
Requirements
Basic Electrical Engineering knowledge
Description
Dear fellows,
This is the most comprehensive online training of MV switchgear. Here you will learn all thing about MV Switchgears.
In an electric power system, switchgear is composed of electrical disconnect switches, fuses or circuit breakers used to control, protect and isolate electrical equipment. Switchgear is used both to de-energize equipment to allow work to be done and to clear faults downstream.
we will go through the following topics
An overview of electrical transmission substation.
Basic concepts about circuit breaker and Types of circuit breaker.
Compartments of MV SWGR
Current Transformer
Voltage Transformer
Earthing Switch
Two-position Switch
Protection Relay
Operations of MV SWGR
Mechanical interlocks of MV SWGR
CB Trolley components
CB Mechanism
Why don't the distributor's switchgear have the same capacity ?
The importance of having a dc ac voltage inside the distributor cells
DC loop drawings
AC loop drawings
The main rules for reading the schema of current circuits and the reasons that lead to their explosion.
Understand the general philosophy of closing, triping and interlock circuits.
Upstream & downstream interlocks
What is the working theory of anti-pumping relay and anti slam ?
Importance of trip circuit supervision in the early detection of circuit breaker faults.
The most important modifications in the schema before the distributor enters the service.
The most important modifications before energize
Who this course is for
- Electrical engineers
- Student at the Faculty of Engineering, Electrical Department
- Electrical technician
Homepage
https://www.udemy.com/course/testing-commissioning-switchgear


Buy Premium From My Links Hot4share To Get Resumable Support and Max Speed


DOWNLOAD FROM HOT4SHARE.COM
Download (Uploadgig)
DOWNLOAD FROM UPLOADGIG.COM
Download ( Rapidgator )
DOWNLOAD FROM RAPIDGATOR.NET
Links are Interchangeable - No Password - Single Extraction